Cases /Factory Audit

Caught at Pre-Shipment: Packaging That Would Not Survive

Goods met specification; the cartons did not. A drop test on packed units before loading changed the packaging, not the shipment date.

5 min read Reading time
October 26, 2026 Updated
Factory Audit Filed under
On this page9 sections
  1. Background
  2. The problem
  3. Scope
  4. What we did
  5. What we found
  6. Deliverables
  7. Result
  8. Limitations
  9. Next step

Quick read · Factory Audit

The product passed every check. The carton did not, and the carton was what the customer would see first.

Typical scenario. Assembled from recurring project patterns, not a single client record. No client name or order value is disclosed.

Background

Small appliances, repeat order, buyer shipping to retail distribution. Deliverable: pre-shipment inspection. Timeframe: one visit plus follow-up.

The problem

Previous shipments had arrived with crushed corners and a small but consistent damage rate. The factory considered it normal for export packing.

Scope

Verify the finished goods against specification and assess whether the packing could survive the stated distribution route. No packaging redesign by us.

What we did

The inspection followed the agreed sampling plan for the product, then added a step the plan did not include: packed cartons were dropped from the height the route implied, and opened afterwards.

Units were intact. Inner dividers had shifted, and two of five cartons showed corner deformation beyond what the buyer’s retail partners accept. The factory’s position was that goods left the plant undamaged, which was true and irrelevant.

The finding was written as a defect class with photographs, not as an opinion. A revised divider and a stronger corner board were specified and tested on the same day.

What we found

Product conformity and packaging conformity are two separate verdicts. Most inspection plans only define the first.

Deliverables

Inspection report with defect classification, drop-test photographs, packaging change specification, and a re-check record on the revised cartons.

Result

Packaging revised before loading; the shipment left on the original date with the revised cartons.

Basis note: no damage rate is claimed as an improvement, because a single shipment cannot establish one.

Limitations

  • No product, factory or buyer is identified.
  • The drop height used depended on the stated route; a different route produces a different test.

Next step

If damage has been “normal” for several shipments, define the packaging acceptance criteria before the next inspection. Supply chain execution covers the checkpoint scope.