On this page9 sections
- What buyers get wrong
- The categories we handle
- Documents and certifications that matter
- What we check inside the plant
- Which belts fit which product
- Where the cost sits
- Failure modes at this stage
- How an engagement runs
- Next step
Electronics is the category with the widest gap between what a supplier appears to be and what it can actually do. A design house with a good website, a trading company with a component database and a factory with two SMT lines can all quote the same board.
What buyers get wrong
- Treating the BOM as a price list. The same BOM sourced through different channels differs by 15–40%, and the difference is component authenticity and lead time, not negotiation skill.
- Assuming the assembly house sources the components. Many will, at a markup, from whichever channel clears their margin that week.
- Testing the prototype, not the process. A perfect first article from a hand-built line says nothing about yield at 5,000 units.
- Skipping the certification entity question. Whose name is on the report decides whether your product can legally be sold.
The categories we handle
- Consumer electronics — chargers, cables, hubs, audio, wearables, small appliances.
- PCBA and components — board assembly, connectors, displays, passive and active components.
- Power and energy storage — battery packs, BMS assembly, portable power stations.
- LED and lighting — modules, drivers, finished fixtures.
- Industrial control — boards, sensors, enclosures, cable assemblies.
Documents and certifications that matter
- EU — EMC 2014/30/EU, Low Voltage 2014/35/EU, Radio Equipment 2014/53/EU for anything wireless, RoHS 2011/65/EU, and a declaration of conformity in your company’s name.
- US — FCC Part 15 for unintentional and intentional radiators; UL or ETL listing where the retail channel requires it.
- Batteries — UN 38.3 transport test report, IEC 62133 for cells and packs, and the safety datasheet for shipping.
- Japan and Korea — PSE (with the correct diamond or circle mark) and KC certification.
- Chemicals — REACH SVHC declaration and, for California, Proposition 65 statements.
Two checks catch most problems: the applicant name on the report, and the model list. A report covering “similar models” is not a report covering your model.
What we check inside the plant
- How many SMT lines, what placement capability, and whether they run overnight or only day shift.
- Whether incoming component inspection exists, or reels go straight to the line.
- Reflow profile records per product, and who signs them.
- ICT, FCT or flying probe — and what percentage of units is actually tested versus sampled.
- Traceability: can they pull the component lots for a board serial number six months later.
Which belts fit which product
- Consumer electronics and PCBA — Shenzhen and Dongguan, with the component market as the pricing reference.
- Small appliances and power — Ningbo and the Cixi belt.
- Precision and automotive electronics — Suzhou and Kunshan.
- Lighting — Zhongshan and the Shenzhen–Dongguan corridor.
Where the cost sits
On a board, components are typically 60–80% of cost, assembly and test 10–20%, and the rest is overhead and margin. Which means the negotiation that matters is the BOM, not the assembly price. On a finished consumer product, plastics and tooling, packaging and certification each take a visible share, and certification is the one buyers most often forget to budget: a re-test for a variant can cost more than the tooling amendment.
Failure modes at this stage
- Component substitution after approval, with the same part number and a different supplier.
- Yield problems discovered at scale because the first article was hand-soldered by an engineer.
- Certificate in the supplier’s name, which the buyer cannot use for customs or retail.
- Firmware locked to the supplier, so a second source cannot be qualified later.
How an engagement runs
We start by establishing what the supplier actually is — design house, assembler, or trader — because that decides the commercial terms. Then a BOM review, then a shortlist, then sample and pilot production with test records. Certification is planned from the beginning rather than after the pilot, because it often reveals a design change that costs more later.
Next step
Send the BOM, the target market and the annual volume. We will tell you which parts of the cost are negotiable and which are fixed by the market. Submit a request, or start with electronics sourcing for the category detail.