On this page11 sections
- What this service is for
- What we prepare before you arrive
- How the day runs
- What we record
- What this is not
- Cities and routing
- What it costs
- Project types we have run
- Questions we get asked
- Where our responsibility ends
- Next step
A factory visit is a one-day audit done by eye and by question. The interpreter is the only person in the room who can hear both what is claimed and what is actually true — and the only one who can tell you, quietly, that the answer you just received was not an answer.
What this service is for
- First visit to a shortlisted supplier. Confirm the plant exists, the lines run, and the people who answered your emails are real.
- Pre-order verification. Capacity, process records, calibration, defect handling — the four things that decide whether the order ships right.
- Problem visit. Something has gone wrong and you need to look at it in person without turning the day into an argument.
- Multi-plant comparison. Two or three factories in one or two days, which is a routing problem as much as an interpreting one.
What we prepare before you arrive
One page per factory, agreed with you in advance:
- The five questions you must get answered, in priority order
- What would make you walk away — a threshold, not a feeling
- What you want photographed, and what the factory may object to
- Who you need to meet: the owner, the export manager, the production manager, or the QC lead
Without that page, the day fills with whatever the factory wants to show you, which is always the clean line and never the rework area.
How the day runs
- Arrival and document check. Business licence, registered scope, registered address against production address. Twenty minutes, and it eliminates a category of supplier immediately.
- Floor walk. Loading bays, lines running or idle, material area organised by grade or piled by convenience, finished goods labelled by order or not.
- Records review. Process parameter sheets at the station (not in the office), in-process check points with a written standard, calibration records with dates, corrective action reports from the last quarter.
- Capacity conversation. What is scheduled for the next four weeks, and how much of it belongs to the largest existing customer.
- Closing meeting. Findings acknowledged on site, in front of the factory, rather than argued by email a week later.
What we record
Quotes, commitments, who said what, and photographs of anything that contradicts a claim. The written note is deliberately plain: what was seen, what was claimed, and where the two differ.
We do not soften a bad visit into a polite one. If the plant cannot show a parameter sheet, the note says so, and you can decide what that is worth.
What this is not
It is not an audit with a verdict, and it is not a certification. Those require a different scope, a different person and a defined standard. An interpreting day gives you eyes and ears; an audit gives you a scored report against a standard. Conflating the two is how buyers end up with a document that looks authoritative and proves nothing.
If you need both, book both. We will tell you which one your decision actually requires.
Cities and routing
Permanent coverage in Shenzhen, Dongguan, Foshan and Guangzhou — same or next-day. Scheduled by project in Yiwu, Ningbo, Suzhou and Shanghai with two to three days’ notice.
Routing matters: three factories in Dongguan and Huizhou in one day is realistic; Dongguan to Ningbo in one day is not. Send the addresses and we will tell you what fits before you book flights.
What it costs
Day rate, eight hours. Multi-factory days in the same district are usually the best value; cross-city days add travel and reduce the useful hours.
Price on request. Excluded and always listed: inter-city travel, overtime, and any third-party testing or audit fee.
Project types we have run
- Three-plant day, Dongguan. Chinese–English, business level. Two plants eliminated on licence scope and records; the third became the order.
- Problem visit, Foshan. Chinese–English. Finish defect disputed for three weeks by email; on site it was visible in ten minutes and documented with photographs.
- Multi-city comparison, Shenzhen–Suzhou. Two days, technical level. Capacity claims did not survive the arithmetic on the second day.
Questions we get asked
Can the interpreter tell us if the factory is lying? They can tell you when an answer does not match the question, or when a claim contradicts a document. That is more useful than a verdict, and it is defensible.
Should the visit be announced? Yes for a first visit — you want to see the plant as it normally runs, and unannounced visits usually get a tour of the car park. For a problem visit, announced is also right: you want the people who can decide in the room.
Can we photograph everything? Most factories allow the floor and refuse tooling, customer labels or process sheets. Ask first; a refused photo is itself information.
Do we need the owner present? If the decision involves price, capacity or tooling, yes. A visit where nobody can commit is a visit you will repeat.
Where our responsibility ends
- We are responsible for interpretation accuracy, the pre-visit brief, punctuality and the written record.
- Third parties are responsible for audits, certifications, laboratory results and any engineering verdict.
- You are responsible for the commercial decision, the questions you prioritise, and what you do with the findings.
Next step
Send the factory names, the city and the date. We will tell you what fits in a day, what needs two, and which questions to ask first.
Send the factory and date · See factory services · What to check during a visit