This site uses cookies to remember your language and measure which pages help. Accept all, or keep only what is necessary. Details in our Cookie Policy.

China Factory Sourcing

On this page11 sections
  1. What this service is for
  2. How the short list is built
  3. What we screen for, and what we do not
  4. Product categories and cities
  5. Who does the work
  6. Timeline that is realistic
  7. What it costs
  8. Project types we have run
  9. Questions we get asked
  10. Where our responsibility ends
  11. Next step

Finding a factory is a filtering exercise, not a search. Anyone can produce a hundred names; the work is producing a short list you can defend, with the reason each one is on it written down.

What this service is for

  • First sourcing project. You know the product and the target price; you do not know which city, which supplier type or how to tell them apart.
  • Switching suppliers. The current one has slipped on quality, capacity or communication, and you need an alternative that is verified before you commit volume.
  • New product line. The category is adjacent to what you already buy, and your existing supplier cannot make it.
  • Multi-country consolidation. You buy several categories and want them coordinated from one place in China.

How the short list is built

Four stages, each with a written output:

  1. Long list — 10 to 15 factories. By city and category, from our own records and public registries. Output: a list with the city, the product fit and why each one is included.
  2. Paper screening — 5 to 6 survive. Licence scope, export registration, product fit, stated capacity. Output: a screening note per factory with the reason for keeping or dropping.
  3. Site verification — 3 to 4. Process records, in-process checks, calibration, defect handling, capacity conversation. Output: an audit note per factory with photographs.
  4. Quotation on identical terms. Same specification, same Incoterm, same quantity, same payment terms. Output: a comparison table, not a pile of PDFs.

If a factory drops out at stage two, you are told why. A short list without reasons is just a shorter list.

What we screen for, and what we do not

Screened: licence scope covers your product; the registered address matches the production address; export experience in your market; capacity consistent with your volume; whether they own the tooling or subcontract it.

Not screened, and said plainly: whether they will be a good long-term partner, whether their price is the lowest available, and whether their quality will hold for two years. Those are answered by a trial order, not by a visit.

Product categories and cities

The city follows the process, not the reputation:

  • Plastic parts with a new mould — Dongguan. High volume with tight tolerance — Suzhou.
  • Consumer electronics, drones, energy storage — Shenzhen.
  • Furniture, ceramics, sanitary ware — Foshan.
  • Apparel, cosmetics, leather, wholesale — Guangzhou.
  • Small commodities, housewares, gifts — Yiwu.
  • Appliances, auto parts, machinery — Ningbo.
  • Precision manufacturing, medical devices — Suzhou.

Send the product and we will name the two cities that make sense before anyone quotes a flight.

Who does the work

A sourcing coordinator owns the list and the comparison; a site auditor runs the visits; an interpreter is added when the factory conversation is in Chinese and the buyer is not. One person cannot do all three well on the same day.

Every project has a named owner from the first reply to the final comparison table. If that person is away, you are told who is covering — not left to discover it.

Timeline that is realistic

A first short list: five to seven working days. Site verification of three factories in one city: two to three days plus a report. Quotation comparison: three to five days after the factory receives a complete specification.

What stretches it: an incomplete specification, a category with few qualified plants, and Chinese New Year. What does not stretch it: pressure. A rushed short list produces a bad supplier and a second project.

What it costs

Project fee, quoted by category, city and number of factories. Sourcing and verification are separate lines so you can see what the visit costs on its own.

Price on request. Excluded and always listed: inter-city travel, third-party testing, samples and courier, and the goods themselves. We do not take commission from factories — that is the only way the short list stays honest.

Project types we have run

  • Hardware sourcing, Dongguan — three factories visited. Two eliminated on licence scope and on process records; the third became the order after a trial run.
  • Furniture, Foshan — six shortlisted, two visited. Finish standard was the deciding factor, not price; the comparison table made that visible.
  • Auto parts, Ningbo — capacity check. The claimed monthly output did not survive the arithmetic on cycle time and stations.

Questions we get asked

Do you guarantee the factory is good? No. We guarantee what was checked and what was found, in writing. Whether that is good enough for your order is your decision.

Can you get us a lower price? We run a comparison on identical terms, which usually produces a real number. We do not negotiate against a factory we also take money from.

How many factories should we visit? Three is the practical number for one city in two days. More than that and the notes blur.

What if none of them are suitable? You get the screening notes and the reason each was dropped, which is itself useful — it usually means the specification or the price band needs revisiting.

Where our responsibility ends

  • We are responsible for the screening, the site notes, the comparison on identical terms and the named owner.
  • Third parties are responsible for the factory’s own claims, certifications, and any testing or inspection body.
  • You are responsible for the specification, the commercial decision, the purchase contract and payment.

Next step

Send the product, the target quantity, the price band and the destination. You get a written scope with the number of factories, the cities and the deliverables before anything is booked.

Send the specification · See the industrial belts · Factory audit scope

Need a price? 3 fields · reply in 1 business day
Get a quote