On this page13 sections
- What you are buying
- Where it fits
- Scope agreed in advance
- What gets checked
- How the day runs
- Who does the work
- Coverage by city
- What it costs
- What the report contains
- When a factory fails
- Questions we get asked
- Where our responsibility ends
- Next step
A factory audit answers one question: can this plant hold this order, at this quality, on this date. Everything else is secondary. This is the scope, and what the report actually contains.
What you are buying
A site assessment against four weighted areas — process records, in-process inspection, calibration, defect handling — with a written note per area, photographs, and a verdict you can defend to a colleague.
Where it fits
Before the first order, or before a volume step-up with an existing supplier. An audit after the third shipment has failed is a post-mortem, not a decision tool.
Scope agreed in advance
- Which product and which lines are being assessed
- Whether the visit is announced (usually yes for a first visit; unannounced for a social compliance concern)
- Who must be present — owner, export manager, production manager, QC lead
- What the factory may refuse to photograph, agreed so the refusal does not derail the day
What gets checked
- Identity. Business licence, registered scope covering your product, registered address against production address, export registration.
- Process records. Parameter sheets at the station, signed and dated — not in the office. A plant that keeps records in the office cannot control the line.
- In-process inspection. A defined check point with a written standard, and someone who can name it.
- Calibration. Instruments calibrated, with a record showing dates.
- Defect handling. A segregated area and a rework record. Defects mixed back into the flow is a fail.
- Capacity. What is scheduled for the next four weeks, and how much of it belongs to the largest customer.
- Tooling. Storage, identification, maintenance record. Moulds on the floor and unlabelled is a finding.
How the day runs
Document check, floor walk, records review, capacity conversation, closing meeting with findings acknowledged on site. Four to five hours for a single plant; two plants in a day only if they are minutes apart.
Who does the work
An auditor with sector experience, plus an interpreter where the audit is conducted in Chinese with a buyer who does not speak it. The auditor writes the verdict; the interpreter does not soften it.
Coverage by city
Permanent in Shenzhen, Dongguan, Foshan and Guangzhou. Suzhou, Ningbo, Yiwu and Shanghai scheduled with three to four days’ notice because of travel.
What it costs
Per factory, by scope and city. A single-plant assessment is one price; a two-day, three-plant comparison is another.
Price on request. Excluded: laboratory testing, certification body fees, travel outside the permanent cities, and any remedy work at the factory.
What the report contains
- Findings per area, with photographs and the specific evidence
- A verdict per area, not only an overall impression
- The gaps between what was claimed and what was seen
- What could not be verified on the day, and why
- A recommendation: proceed, proceed with conditions, or do not proceed
When a factory fails
You receive the findings and a verdict per area. We do not soften a failed audit into a pass, and we do not drop a finding because the factory was hospitable. One re-check is included on request, because plants do fix things.
Questions we get asked
Is this the same as a social compliance audit? No. Social compliance covers labour, safety and environment against a standard such as Sedex or BSCI. Ours covers whether the plant can hold your order. Different scope, different auditor.
Can you audit a trading company? We can assess the office and identify the actual production site, which is often a different address. That difference is usually the most valuable finding.
How long is the report valid? Six months for capacity and process control. Anything older should be re-checked before a volume step-up.
Where our responsibility ends
- We are responsible for the assessment against the agreed scope, the evidence and the report.
- Third parties are responsible for certification, laboratory results and regulatory compliance.
- You are responsible for the commercial decision and the purchase contract.
Next step
Send the factory name, the city and the product. We will tell you what can be verified remotely and what needs a site visit.
Request a factory audit · See factory services · What to check during a visit