Inspection is a sequence of checkpoints, each cheaper than the failure it prevents. Skip the early ones and the last one becomes a rework bill. This page is the scope, not the sales pitch.
What you are buying
A defined inspection against an agreed standard: which AQL level, which defect classes, and who decides when a lot is rejected. Without those three written down, “inspection” means someone looked at it.
Where it fits in the order
Pre-shipment inspection sits after production is complete and packed, before the goods leave. Mid-production inspection sits while there is still time to correct. They answer different questions and are not substitutes: mid-production catches trends, pre-shipment catches the lot.
Booked against your production completion date, not your ship date. An inspection squeezed into the last two days removes the option to rework.
Coverage and standard
AQL sampling is the default, with the sampling plan and the critical defect list agreed before the visit. Critical defects are zero-tolerance; major and minor follow the agreed level.
We do not accept a buyer-side instruction to “pass it” after the sample has been drawn. A report that changes its conclusion is worth nothing to either party.
What gets checked
- Quantity and carton count against the packing list
- Product function and safety items on the critical list
- Appearance against the signed sample and the colour standard
- Dimensions against the drawing, with tolerance
- Packaging, labelling, barcodes and shipping marks
- Carton drop and stacking where the route requires it
How the day runs
- Arrival and document check. Packing list, approved sample, specification, previous reports.
- Sample pull. Random from finished goods, not from a pile the factory prepared.
- Measurement and function tests. Against the drawing and the critical list.
- Photo record. Same angles as the previous inspection where one exists, so change is visible.
- Closing meeting. Findings acknowledged on site, in front of the factory, before anyone writes an email.
Who does the work
An inspector on site, a third-party laboratory for destructive or chemical testing where required, and a coordinator who keeps the timeline. We do not present laboratory results as our own findings, and we do not certify a product.
Coverage by city
Permanent in Shenzhen, Dongguan, Foshan and Guangzhou — booked with two to three days’ notice. Yiwu, Ningbo, Suzhou and Shanghai scheduled by project, usually three to four days’ notice because of travel.
What it costs
Priced by inspection day plus travel, quoted after the scope is fixed. A one-day inspection for a single SKU is a different job from a three-day inspection across four SKUs and two factories.
Price on request. Third-party laboratory fees are passed through at cost and listed as a separate line. Sampling and courier costs are yours, paid directly.
When a lot fails
You receive the findings, the photo record and a recommendation: rework, sort, or reject. The commercial decision stays with you. We do not negotiate with the factory on your behalf unless you ask us to, and we do not soften a fail into a pass to keep the relationship.
Questions we get asked
Can you inspect without the factory knowing? No. Unannounced inspections are for social compliance audits, not for goods. A factory that refuses access on the day is itself a finding.
What if the goods are not ready? If production is incomplete on arrival, the day is charged and a re-inspection is booked. This is the most common avoidable cost in the whole process.
How long is the report? Standard report within 24 hours of the visit, with photographs. A short summary the same evening by message if you need to make a call that night.
Can you inspect against our own checklist? Yes, and we prefer it. Your checklist plus our standard is better than ours alone.
Where our responsibility ends
- We are responsible for the inspection against the agreed standard, the photo record and the report within the stated time.
- Third parties are responsible for laboratory test results, certification and regulatory compliance.
- You are responsible for the standard, the accept/reject decision, and the commercial consequence.
What you keep
Inspection report with photographs, the sampling record, the measurement sheet, and the closing-meeting note. One file per order, with the date on every page — this is what turns a delay into a claim rather than an argument.
Next step
Send the product, the quantity, the factory city and your production completion date. We confirm the inspection window and the scope before quoting.