The four milestones
- Deposit — buys material and a line slot. Typical range is 20–30% on standard goods, higher on custom tooling.
- Pre-shipment — paid after inspection passes, before the bill of lading is released. This is the milestone that actually protects you.
- Balance — on documents or on arrival, depending on the relationship and the route.
- Retention — a small holdback for the first order only, released after the goods are accepted.
Why the pre-shipment milestone matters
It is the only point where you still have both the goods and the money. Move it too early and inspection becomes advisory; move it too late and you are paying against documents you cannot verify. Tie it to the inspection report, in writing, in the contract.
What suppliers will ask for
Expect a request to reduce the retention and to raise the deposit on custom work. Both are reasonable when the material is bespoke. Trade them for something concrete: a shorter lead time, a named production slot, or a second-release price.
The clause people forget
What happens on a failed inspection. Without a clause, the default is argument. With one, the options are defined: rework within a stated period, sort and re-inspect at the factory’s cost, or cancel the balance and treat the deposit as agreed compensation. Pick one in advance.
When the supplier refuses the split
Refusal is information. A supplier who will not accept a balance against inspection is either cash-constrained, or expects the inspection to find something. Both are manageable, but they are managed differently: the first needs a smaller deposit and a shorter cycle, the second needs a different supplier.
Where refusal is genuine and the supplier is otherwise strong, the compromise is a third-party escrow or a letter of credit with a document check. It costs 0.5–2% of the order, which is cheap against the loss of the entire balance.
Next step
Send the order value, the product type and whether tooling is involved. We will tell you which milestone to hold and what to write into the clause.
Send the order terms or see supply chain scope.
Related reading
Where this guide connects
This page is one entry in a category. The service behind it is where the work actually gets done.
Send a request →