This is the checklist we use on site, in the order we use it. It is not a certification framework — it is the minimum set of checks that separates a factory that can hold your order from one that cannot. Print it, take it, write on it.
Before the visit
- Business licence and its registered scope — does the scope actually cover your product?
- Registered capital and year of establishment
- Whether the address on the licence matches the site you are visiting
- Export licence or customs registration, if you are buying for export
If the licence address and the site address differ, ask why before you travel. It is sometimes a second plant, sometimes a trading company.
On arrival, before the meeting
- Count the loading bays and the trucks in them
- Note the number of production lines and whether they are running
- Look at the raw material area — is it organised by grade, or piled by convenience?
- Check the finished goods area — labelled by order number, or unlabelled?
Production floor
| Area |
What to check |
Red flag |
| Equipment |
Age, nameplate capacity, maintenance log |
Machines idle with no explanation |
| Process records |
Parameter sheets at the station, signed and dated |
Records kept in the office, not at the line |
| In-process inspection |
A defined check point with a written standard |
Nobody can name the standard |
| Defect handling |
A segregated area and a rework record |
Defects mixed back into the flow |
| Tooling |
Storage, identification, maintenance record |
Moulds on the floor, unlabelled |
Quality system
- Is there a documented incoming inspection for materials?
- Are measuring instruments calibrated, and is there a calibration record with dates?
- What is the first-article approval process for a new order?
- Can they show a corrective action report from the last three months?
A factory with no corrective action reports either has no defects or does not record them. Ask which.
Capacity and commitment
- Current order book — how many days of work are already scheduled?
- Which customers take the largest share, and what happens to your order when theirs grows?
- Who is the named contact for your order, and who covers when they are away?
How to score it
Do not score everything equally. Weight the four areas that kill orders: process records, in-process inspection, calibration, and defect handling. A factory that is clean but cannot show a parameter sheet will still ship you the wrong parts, on time and neatly packed.
Next step
If you want this run on a specific factory, send the name and the city. We will tell you what can be verified remotely and what needs a site visit.