Automotive is the most document-heavy category in Chinese sourcing, and the easiest place to buy a certificate instead of a capability. A supplier can hold IATF 16949 and still fail a PPAP, because a certificate proves an audit happened once and a process proves it happens every shift.
What buyers get wrong
- Accepting the certificate as the qualification. The qualification is the PPAP package, and it is specific to your part number.
- Not asking for the control plan. The control plan tells you which characteristics they actually measure, and at what frequency.
- Treating aftermarket as a lower tier. Aftermarket tolerances are often wider, but liability is not.
- Ignoring traceability. Without lot traceability, a field failure cannot be closed, only argued.
The categories we handle
- Metal and stamped parts — brackets, reinforcement panels, exhaust components.
- Machined parts — shafts, housings, hubs, brake components.
- Rubber and plastic — seals, hoses, bushings, interior trims.
- Electrical and electronic — harnesses, sensors, connectors, small modules.
- Fasteners and springs — the category where unapproved substitution is most common.
Documents and certifications that matter
- IATF 16949 with a valid certificate and an audit scope that covers your process — a certificate covering “stamping” does not cover heat treatment.
- PPAP at the level the customer requires, with dimensional results, material and performance test reports, MSA and initial process capability.
- APQP and FMEA, current and specific to the part, not a template from another project.
- Regulatory — ECE R90 for brake parts sold in Europe, REACH and ELV declarations, IMDS entries where the customer requires them.
- Material certificates — mill certificates for steel grades, with heat numbers traceable to the lot.
What we check inside the plant
- Whether the control plan on the line matches the one in the PPAP file.
- Calibration status of gauges, and whether the calibration lab is internal or third party.
- How non-conforming parts are handled — segregated, tagged, or quietly reworked.
- Sub-supplier control: who supplies the heat treatment, the plating, the raw material.
- Change notification: whether a material or process change reaches the customer before the shipment.
Which belts fit which product
- Stamping and metal — Ningbo, Taizhou and the Jiangsu corridor.
- Machining and precision — Suzhou, Wuxi and Changzhou.
- Electronics and harnesses — Dongguan and the Shenzhen periphery.
- Rubber and seals — Ningbo and Xiamen.
Where the cost sits
Raw material is the largest line on most metal parts — often 40–60% — so price follows steel and aluminium indices, and a quote without a material basis clause will be renegotiated within a quarter. On machined parts, cycle time dominates, and the honest question is how many minutes per piece at what spindle utilisation. On rubber, the compound is the cost and the variable: a cheaper compound passes the drawing and fails the life test.
Failure modes at this stage
- Material substitution to a lower grade with the same surface finish, discovered at fatigue testing.
- Heat treatment outsourced to an unqualified shop, with certificates from the wrong lot.
- Capacity promised on the basis of a single shift, then a second shift added with untrained operators.
- PPAP signed off from prototype tooling, with production tooling never re-validated.
How an engagement runs
We begin with the drawing and the customer-specific requirements, because those decide whether a supplier is even eligible. Then a capability screen on the specific process, then a PPAP review with the buyer’s engineer, then run-at-rate before volume. For aftermarket buyers without a formal PPAP requirement, we still use the same four documents in a shortened form — dimensional report, material certificate, control plan and capability study.
Next step
Send the drawing, the annual volume and the quality requirement. We will tell you which suppliers can realistically reach it, and what the first-article process will cost in time. Submit a request, or read factory audit for the on-site method.