Quick read · Factory Audit
Every factory will show you a certificate. Very few will show you a parameter sheet at the machine, dated and signed, from this week. That distinction is the fastest way to tell a controlled process from a managed impression.
What a process record is
A sheet at the station recording the settings that were actually used: temperature, pressure, speed, cycle time, torque, coating thickness — whatever the process depends on. Signed by the operator, checked by a supervisor, dated.
Its purpose is not compliance. It is the ability to answer “why did this batch differ from the last one” without guessing.
Four checks, in order
- Where is it? At the machine, or in an office folder? A record kept in the office is a record of what someone intended, not what happened.
- Is it current? Yesterday’s date, or three months ago? A sheet from March on a line running in November is decoration.
- Is it signed by an operator? Not typed by the engineer who wrote the template.
- Does it vary? If every sheet has identical values for six months, either the process never changes or nobody fills it in truthfully. Ask which.
What to ask the operator
Walk to a station and ask, through an interpreter: “what do you do if this reading is out of range?” Two good answers: “I stop and call the supervisor” or “I adjust and record it”. A bad answer: “I don’t know, the engineer handles that.”
That single exchange tells you more about control than an hour of presentation.
What the absence means
A plant without process records is not necessarily making bad parts. It is making parts it cannot explain, and that matters when something goes wrong: without records, every quality conversation becomes an argument about memory.
What good looks like
- Sheets at the station, in a fixed place, with pens attached.
- Dated within the week, signed by the operator.
- Values that vary with the product being run.
- A deviation note when something went out of range, with the action taken.
Next step
Send the factory name and product. We will tell you which records to ask for before the visit, so the day is spent on what only a visit shows.
Factory audit · Audit checklist · Send the factory
Where this guide connects
This page is one entry in a category. The service behind it is where the work actually gets done.
Send a request →